SMR Gearbox Installation
Satisfactory efficiency depends on proper set up. lubrication and servicing. as a result it is vital the directions from the installation and servicing leaflet. supplied with every gearbox. are followed carefully. some of the important elements of belt and torque-arm installation are listed under.
1. Install pulley on gearbox input shaft as near on the reducer doable, and mount reducer on driven shaft as shut to bearing as practical. failure to complete this can bring about extra loads within the input shaft bearings and output bearings and could induce their premature failure.
two. Install motor and wedge belt drive together with the belt pull at around 90° for the center line concerning driven and input shafts. this will allow tensioning in the wedge belt drive using the torque arm which must preferably be in tension. if output hub runs anti-clockwise. torque arm ought to be positioned the right.
3. lnstall torque-arm fulcrum on the rigid support so that the torque-arm will probably be at roughly proper angles towards the center line with the driven shaft and also the torque arm situation bolt. be sure there is certainly adequate get up while in the turnbuckle for belt tension adjustment.
Hold shut.
Bell drive could be situated in any handy postion. should the torque arm is always to be made use of to tighten the belts, the drive should be at about tight angle for the line between the input and output shafts.
Bell drive could be located towards the suitable if preferred.If output hub rotates clock-wise. position belt drive and torque arm in opposite path to that proven while in the illustration.
Torque arm and belt take up.
Torque arm could be mounted to your right if sought after.