we supply a single-quit remedy for the acquire of mechanical power transmission items in China. Provider & Quality controlWe offer thorough drawings and offer each time required. The group has taken portion in the generating and revising of ISO/TC100 intercontinental chain normal several years in achievement and hosted the 16th ISO/TC100 Worldwide once-a-year assembly in 2004. With 30-yr rich sector experience and information comma we have acquired EPTTization in manufacturing and giving outstanding top quality Big EPTs interval These are fabricated in conformity with outlined sector stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds comma these compact and strong EPTs have stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd operating pace and torque measurement time period The presented assortment is commonly acknowledged by the buyers for functions like the best possible performance comma sturdy design and EPTTer life time period These precision engineered EPTs are widely demanded throughout assorted EPTT comma in which huge EPT reduction is required period of time
Rewards colon
– EPT with Customers apos Patterns
– EPT Machining amp Heat Therapy Talents
– Stringent EPTT EPTT
– Prompt Delivery
-Encounter in Cooperation with EPTT 500 Companies
Approach colon
EPT solEPTT
Normalizing ampTempering-Evidence Machinnig
Quenching ampTempering
End Machining lparTeeth EPT rpar
We can supply you in different procedure conditions
Answers for A lot of End Marketplaces and Purposes
–EPT
–EPTlurgy
–EPTT Technology
–SuXiHu (West EPT) Dis.Hu (West EPT) Dis.
–Cement Plant
–Port EPTTry
–Oil and organic
–Papermaking
–OEM EPT scenario
–EPTT EPTT
Requirements of EPT colon
No time period | Merchandise | Description |
1 | Diameter | le15m |
2 | Module | le45 |
three | EPT | Solid Alloy Metal comma Solid EPTT Steel comma Forged Alloy Metal comma Forged EPTT Steel |
4 | Framework From | Built-in comma 50 % to 50 % comma 4 Pieces and Far more Items |
5 | Warmth Remedy | Quenching amp Tempering comma Normalizing amp Tempering comma Carburizing amp Quenching amp Tempering |
6 | Tooth Kind | Annular EPT comma Outer EPT Ring |
seven | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | ISO comma EN comma DIN comma AISI comma ASTM comma JIS comma IS comma GB |
Inspection and Examination Outline of Girth EPT colon
No time period | Merchandise | Inspection Area | Acceptance Standards | Inspection Phase | Certificates |
1 | EPTT Composition | Sample | EPT Need | When Smelting After Heat Treatment method |
EPTT Composition Report |
2 | EPT Homes | Sample lparTest Bar on the EPT Physique rpar | EPTnical Necessity | Right after Heat Treatment method | EPT Qualities Report |
3 | Heat Remedy | EPTT Human body | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | For the duration of Warmth Treatment method | Heat Treatment Report Curves of Heat Treatment |
four | Hardness Test | Tooth Area comma 3 Points For each ninety deg | EPTnical Need | Right after Heat Treatment | Hardness Teat Report |
Right after Semi Finish Machining | |||||
five | Dimension Inspection | EPTT Body | Drawing | Following Semi Complete Machining | Dimension Inspection Report |
End Machining | |||||
six | EPTic EPTT Take a look at lparMT rpar | Tooth Surface | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Right after Finish EPT Hobbing | MT Report |
7 | UT | Spokes Areas | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Soon after Rough Machining | UT Report |
Soon after Welded | |||||
Soon after Semi Complete Machining | |||||
8 | PT | Defect Spot | No Defect Indicated | Following Digging After Welded |
PT EPTrd |
9 | Mark Inspection | EPTT Human body | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Last Inspection | Photos |
10 | Visual appeal Inspection | EPTT Human body | CIC aposs Prerequisite | Ahead of EPTT lparFinal Inspection rpar |
|
11 | Anti-rust Inspection | EPTT Entire body | Agreed Anti-rust Agent | Just before EPTT | Photographs |
12 | EPTT Inspection | EPTT Entire body | Agreed EPTT Type | In the course of EPTT | Photos |
FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ties For EPT EPT ring colon
No period | Item | Description |
one | Smelting amp EPTT Ability | 40t comma50t comma 80t Collection AC Electric powered Arc Furnace two times150t comma 60t EPTT Ladle Refining Furnace 150t comma 60t Series VD solVOD Furnace 20 times18m Huge Pouring FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ty We can pour 900t refining liquid steel one time comma and obtain EPT poured 600t steel ingots period We can make the substantial good quality steel of a lot more than 260 steel grades as carbon metal commastructural alloy steel and the structural steel comma refractory steel and stainless steel of EPTT necessity period of time The maXiHu (West EPT) Dis.mum bodyweight of casting metal comma grey casting comma graphite solid iron and non-ferrous casting is 600t comma 200t comma 150t and 20t separately time period |
2 | EPT Ability | The only one particular in the phrase comma the most technologically EPTd and the greatest specification18500t Oil Push comma geared up with 750t periodm forging procedure EPTT 8400t Water Push 3150t Drinking water Press 600t Water Push Phi5m EPT EPT Ring Mill lpar WAGNER commaGermany rpar Phi12m EPT EPT Ring Mill We can roll rings of diverse EPTs of carbon steel comma alloy metal comma higher temperature alloy metal and non-ferrous alloys this sort of as copper alloy comma EPT alloy and EPTTium alloy time period Max period of time Diameter of rolled ring will be 12m interval |
three | Warmth Remedy Capability | nine times9 times15m comma8 times8 times12m comma6 times6 times15m comma15 times16 times6 period5m comma16 times20 times6m comma7 times7 times17m Sequence Heat Furnace and Heat Remedy Furnaces phi2 period0 times30m comma phi3 period0 times5 period0m Series Heat Treatment method Furnaces phi5 period0 times2 period5m comma phi3 period2 times1 period5m comma phi3 period0 times5 period0m comma phi2 period0 times5m Series Carburizing Furnaces amp Nitriding Furnaces amp Quenching Bathes phi2 period0 times30m Well Type CNC EPT Furnaces Phi3 period0 times5 period0M Horizontal Gas Temperature-differential Furnace EPTT-frequency and EPTT-position Quenching Lathe of Pinion Shaft |
four | Machining Functionality | one interval geq5m CNC EPT Responsibility Vertical Lathes 12m CNC EPTT-column Vertical Lathe 10m CNC EPTT-column Vertical Lathe 10m CNC Solitary-column Vertical Lathe six period3m EPT Obligation Vertical Lathe 5m CNC EPT Obligation Vertical Lathe |
2 interval geq5m Vertical EPT Hobbing EPTTs 15m CNC Vertical EPT Hobbing EPTT 10m EPT Hobbing EPTT 8m EPT Hobbing EPTT 5m EPT Hobbing EPTT 3m EPT Hobbing Machining |
||
three time period EPTTorted EPT-precision EPT EPT EPTTs period8m~three period5m CNC Molding EPT EPT EPTTs |
||
4 time period Big Dull amp Milling EPTTs 220 CNC EPTr-mounted Unexciting amp Milling EPTT two hundred CNC EPTr-mounted Unexciting amp Milling EPTT one hundred sixty CNC EPTr-mounted Dull amp Milling EPTT |
Screening Method colon
middot QA DOC colon EPTT Composition Report comma EPT Homes Report comma UT Report comma Warmth Treatment Report comma Proportions Examine Report
middot The information on chemical composition report and mechanical properties report are authorized by third get together comma HangEPT Ship EPT EPT Institute comma CSIC time period
middot UT test colon one hundred percnt ultrasonic check in accordance to EN15718-three comma SA388 comma Sep 1921 C solc and so on period of time
middot Heat Therapy Report colon offer unique copy of warmth treatment curve soltime desk period