We makes certain the security and consistency of the essential function of elements.- EPG Team the greatest agricultural gearbox and pto manufacturing unit in China with 5 distinct branches. For a lot more particulars: Cell/whatsapp/telegram/Kakao us at: 0086-13083988828
PP PE agricultural Dewater extrusion Machine is mainly used for drying the film.
Wor ept theory and software
With the screw force to dewater the water from the substance, Washed plastic movie, agriculture film, PP woven bag, big pac ept bag,PE farm film,ton bags, nylon and so on, can be dewater from this device. Unique created screw and gearbox can be dry the materials really nicely. When use this material pelletizing or granulation, the potential will be considerably higher, it can dewater far more than ninety five%-99.5%. (Up to consumer need, the material can be plastizing or half plastizing)
Gain of this machine
one. Special made screw and pressure way, can dry the material much more better than normal device
two. Dewater: can be 98%
3. Advantage technological, minimal electricity, reduced noise, easy to run, safty and cost resonable
4. This Mechnical strain dewater, evaluate with scorching wind dryer program, this device can save room and electricity
Venture summary:
NO. | Product. | Spec. |
one | Materials | washed PP ,PE film |
two | Capacity | output:600-800kg/hr |
3 | Electric power energy | 380V,50Hz,3 Phase |
4 | Lastly merchandise moisture | ≤2% |
5 | Mounted power | 150KW for entire plant |
6 | Electricity use | 70% of installed electrical power |
seven | Plant location | > 36 Sq. meter > 3 meter peak Estimate line dimensions: 6m(Size)* 2 m(Width)* 3 m(Height) we can make the line turn as I or L condition to match the buyer’s plant |
eight | Manpower | 1-2 People required |
9 | Payment conditions | 30% by TT as deposit Balance paid by TT before shipment. |
Shipping time | forty Wor ept days considering that obtain the deposit | |
Bundle | Pac ept by movie. | |
Warranty Period of time | 12months since the date of BL. | |
Shipping and delivery | By sea | |
Offer you validity | 60Days |
Equipment photoes
Screw and barrle inside of of the device
Die of the device
Machine below producting
Final substance after the machine
Device all elements:
Item NO. | Product title | Amount | Electrical power |
one | Belt conveyer | one established | two.2kW |
2 | Main device | 1set | 110kw |
3 | Pelletizing | one established | five.5kw |
4 | Wind transmission program | one established | five.5kw |
5 | Storage Silo | 1 set | _ |
6 | Electrical handle box | 1 set | _ |
Kindly come to feel cost-free to contact me for much more particulars of the device.
1. We supply underneath needed documents with the machine:
- Device layout
- Electrical energy diagram
- Machine certificate
- Basic guide book/upkeep ebook
2. We supplies a single-yr high quality assure. During this period, if the machine’s malfunction is authorized t pto gearbox hydraulic pump Uyo Nigeria o be our duty, we will deliver the damaged spare parts to you with DHL courier or other way within 7 workdays right after receiving the complainant. And send the technicians to the buyer’s manufacturing unit for keeping. All costs are in our account.
three. Right after 1 yr ensure, If you require we can provides payable spare elements and technician’s Browsing routine maintenance, and any broken spares we can deliver you quickly as attainable.
4. We believe in that our quotation meets with your demands and we will gladly furnish you with further info.
5. 24Hours services : Cell+86-13915707468
The use of original products manufacturer’s (OEM) element quantities or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our firm and the outlined alternative areas contained herein are not sponsored, authorized, or produced by the OEM.